• Hove

    Hove

  • Hove

    Hove

  • Hove

    Hove

Hove

A former Jaguar Land Rover dealership. Demolition and site clearance works with new construction of a 4 storey self storage facility including double basement and flexi offices. Target to achieve Breeam Excellent accreditation with green roof, roof mounted solar photovoltaic arrays and electric vehicle chargers.

  • Main Contractor: Mclaren Group
  • Construction Site Manager: Dale Burton
  • Store Opening Date: 21st March 2022
  •  

2018

Hove---Bird-s-eye-looking-North.jpg

April

Site acquired April 2018

2020

Hove Deomolition 3.jpg

August

Demolition in progress 6th August 2020

2020

Hove - demolition complete

October

Demolition complete

2020

November

Shell construction works begin

2021

Hove - Bulk excavation site complete.jpg

 

End of March

The bulk excavation of the site is now complete, this will form our basement level. 

Whilst excavating we unearthed the previously known historical rail cutting which dates back to 1898, this ran though the site until the 1950’s, at which point it was back filled and the site was then redeveloped.

2021

Hove - structural slab IMG_2342.JPG

April

Works are progressing to complete the structural slab to the basement prior to the reinforced concrete walls to the perimeter.

2021

Hove attenuation tank 003.jpg

May

Attenuation Tank going in, this will eventually be buried under the car park area.

2021

Hove perimeter concrete wall IMG_2409.JPG

May

The 3 stages of the perimeter reinforced concrete wall can be seen in this photo. Steel reinforcement has been installed to the left of the photo before the temporary support framework is erected prior to the concrete pour on the right of the photo. Finally moving back across to the left, the finished concrete wall lining can be seen.

2021

Hove steel reinforcement instal 004.jpg

Early July

The rain might have fallen but this hasn’t held up progress to install the steel reinforcement for the remaining ground floor section, whilst in the distance the main steel frame has commenced.

2021

Hove steel frame nearing completion.jpg

September

Steel frame nearing completion.

2021

Hove shell almost complete .jpg

November

Shell almost complete.

2021

29th November

Fit out works start.

2022

21st March

Store opens.

March

2022