The Property team agreed Heads of terms to purchase Alpha House, Regis Road in March 2021. The building was occupied by a high street clothing retailers buying department and their dressmaking/tailoring team.

The site of the new store is located approximately 200m west of Kentish Town Railway Station with the High Street less than 500m away. Historically the site was occupied by railway sidings with associated embankments and cuttings. A carriage and wagon repairing shed was present from 1952 to the 1960’s with smaller ancillary buildings in use. By 1985 the majority of the site was cleared and levelled. The current two storey high warehouse and associated first floor offices was constructed in 1990 with no significant changes in layout until the present day. The local vicinity is a mixture of industrial and commercial premises with some residential accommodation opposite the site.

The new store proposal is for a self storage facility with flexi offices totalling 68,000 net sq ft MLA at ground floor level plus four floors of storage.

The redevelopment proposals will be submitted to the local planning authority by January 2023. We are targeting a BREEAM accreditation of Excellent.

Demolition and site clearance works are due to start once planning approval is obtained for the redevelopment.

Nigel Hartley, Big Yellow Construction Director
 

  • Architect:  Mountford Piggott
  • Engineer:  Campbell Reith
  • Project Manager & QS: Paragon
  • Principle Designer (Health & Safety):  RGP Development Services
    M&E Services:  Silcock Dawson

Target Programme
Shell Construction: tba
Fit out due: tba
Store Opening Date: September 2026

  •  

2022

Kentish Town existing site.jpg

 

Spring / Summer 

Existing site

2022

Spring / Summer 

Site clearance and enabling works

2023

Kentish Town pre demolition.jpg

August

Pre demolition soft strip commences

2024

Kentish Town Site Hoarded Off.jpg

September 

Site hoarded off

2025

Kentish Town Attenuation tank being laid.jpgJuly

Attenuation being laid

2025

Kentish Town Groundworks underway.jpgJuly

Groundworks underway

2025

Kentish Town Drone View.jpgAugust

Drone view of site

2025

Kentish Town Mezzanine Floor installed.JPGSeptember

Mezzanine floor installed

2025

Kentish Town Foundations cast.jpgSeptember

Foundations cast including holding down bolts

2025

Kentish Town First steels going up.jpgEarly October

First steels going up

2025

Kentish Town Steel frame almost complete.jpgLate October

Steel frame almost complete

2025

Kentish Town Blockwork being laid.jpgNovember

Blockwork being laid

2025

Kentish Town Storage partitions being installed.JPGNovember 

Storage partitions being installed

2025

Kentish Town Brick course underway.jpgNovember

Brick course underway

Store opening

Sept 26